Log into the
instance of
Fieldglass.
Select Analytics then Create
Report.

Select Time
Sheet. This will
open the report creation
page with the correct
options
available.

Columns will
default into the report
but should be removed by
selecting the X. Using the Search For Fields option search for the
below fields and drag and
drop them into the section Columns in the
correct
order.

Fieldglass Report Fields
Field Name | Category |
---|---|
Time Sheet ID | Time Sheet/ID |
Worker ID | Worker/Details |
Last Name | Worker/Details |
First Name | Worker/Details |
Buyer Code | Buyer/Details |
Site Code | Time Sheet/Details |
Site | Time Sheet/Details |
Cost Center | Time Sheet/Details |
Time Sheet Billable
Hours | Time Sheet/Hours
Worked |
Rate Component Code | Time Sheet/Rates |
Time Entry Date | Time Sheet/Line Items |
Time Sheet Approved
Date | Time Sheet/Audit |
Time Sheet Start Date | Time Sheet/Details |
Time Sheet End Date | Time Sheet/Details |
Time Sheet Submit Date | Time Sheet/Details |
Time Sheet Status | Time Sheet/Details |
Time Sheet Billable Hours
(by Rate Category) | Time Sheet/ Hours
Worked |
Revision #*** | Time Sheet/Details |
Bill Rate | Work Order/Rates |
Worker End Date | Worker |
***NOTE: The
Revision # column will
only be available if this
Fieldglass client allows
revised timesheets. If not
this option will not
appear when searched but
the report can be created
without this
column.
Fieldglass Report
Filter
Under Filter
Parameters
add:
Time Sheet
Status>
Equals> Select the
drop down and include:
Approved, Invoice,
Paid, Payment Pending,
Pending Allocation,
Pending Approval,
Pending Review,
Pending Review by
Supplier, Pending
Validation.
**Note: We recommend
pulling all pending and
approved time each day. When
the timecard gets approved it
will then create an exception
in Exchange to change the
status. Once this exception is
processed BTE this will update
the timesheet to approved. If
this is not possible, separate
reports will need to be
created to pull pending and
approved time to meet your
company’s sweep
requirements.
Add Time Sheet Submit Date (Time Sheet/Details)>In last>30>Days
Add Time Sheet Submit Date (Time Sheet/Details)>In Last>24>Hours
**Note: If testing older
weeks, the Time Sheet Submit
Date can be changed to Time
Sheet End Date>Between and
then the testing week dates
can be entered, then select
Run Now.
Change the Filter Logic to 1
and (2 OR 3) then select OK to save the
changes.

Select the filter
for the Rate
Category>Equals
and select all the
rates to add them
to the right side of the
pop-up window, then select add.
Select all of the Buyers that should
be included in this report
and move them to the right
side of the pop-up window,
then select add.

Saving the Fieldglass
Report
Enter a report Name. It is
important to create a
report name that is unique
for you. We recommend
putting your company name
and your client’s name in
the report name. This way
email delivery will always
be able to find your
reports. If you have a
sweep file and an Approved
file, then you need to
include this in the report
name as well. So your
reports would have part of
the name be
Agency_Customer_Pending
and
Agency_Customer_Approved.
Select a
folder. This does not
drive anything within the
report, but you must be
able to select a folder to
save the report. If you do
not see a folder option
then your login does not
have Admin access and will
need to be
updated.
Select the Output
Format of CSV and save the report.
Once the report saves,
select the Run Now option.

***Note: If you
receive the following
“Error: Number of columns
exceeds the limit 500.
Narrow the column
selections and try again.”
Then remove some of the
Rate Category’s that were
added. One way to
determine which Rate
Categories should be left
is to remove the bill rate
and run the report. Then
review the report to see
which rate categories have
hours and ensure those
categories are
selected.
Scheduling Reports Within
Fieldglass
This report then
can be accessed through Analytics>My
Reports>Actions>Go
to Run Time Page.
From the Run Time Page Actions>Schedule
Report to have the
report emailed to
Exchange.
A Schedule
Name will default
as the report name which
can be left as is or
updated if necessary. Delivery Type should be Attachment, Frequency is Daily, Start Date/Time should be the first date
you want the file to run
and the time of day the
report should be run. We
recommend scheduling the
report to run overnight so
that the report is ready
to process first thing in
the morning. For Email
Addresses enter
both the Cert and
Production email provided
by Bullhorn separated by a
semicolon. This will
eliminate the need to
update the reports when
you are ready to move them
into
production.

Exchange Email
Box
Login to https://login.microsoftonline.com/ with the provided
details. If it asks for
additional verification
information, select cancel
as it is not necessary to
provide. This
email box will show all
emails received from tools
so you can verify the
email is set up correctly
and being received by
Bullhorn. If a file needs
to be reprocessed as it
did not process, mark the
email as unread and this
will prompt the system to
process the email again.
The file should normally
process within 10-15
minutes depending on its
size and the other files
the system is processing
at the
time.
Exchange Fieldglass Template
Creation
After logging into
Cert select
the

and
then

The following
window will pop-up for
initial information to be
entered so the template
can be
created.
Enter the Template Name. This
field will help your team
to know what file they are
reviewing and helps the
Bullhorn team if any
troubleshooting is
required. As such, the
name should include your
company name (or an
abbreviation) and the name
of the VMS and the
client.
Enter the Customer
Associations which
is the client ID from the
ATS that correspond to the
buyers/employees that are
included in the file from
Fieldglass and select the
number that shows as a
drop down under the field.
The name should then show
populate below the
box.
Select the Source of
Fieldglass.
Select Create.

The template will
now show up as a new
pop-up
window.
At the top there
are tabs that determine
how the template will
function.
File Processing
Tab
On the File
Processing tab
enter the Start
Date, this can be
left blank for testing if
desired, but is critical
for ensuring time for
weeks prior to the
transition to Bullhorn do
not get duplicated when
moving an existing client
into Exchange. The Start
Date should be the first
date for which you do not
want to load time. Select
an Approval Status
Type. This should
be left as Peoplenet
Approval Status unless you need to see
status changes such as
Approved to Invoiced as
these will not show since
they are both considered
approved.
For the Auto
Process Employee
Matches the Match Types should
be set to Full Name
Without Middle
Initial. This will
allow this system to match
employees from the VMS
file to employees under
that customer ID if they
have the same name. If
there are more than one
employee with the same
name, then the system will
only suggest a match for a
person to manually
confirm.
Auto Process
Assignment Matches should remain checked
as one-to-one. This
will allow employees that
have been matched on the
employee level to have
their assignments match if
there is only one
assignment in both the VMS
and in Bullhorn. If there
is more than one
assignment in either
system, then the system
will suggest an assignment
match, but it will need to
be confirmed by a person
prior to any time
loading.
Auto Process for
Matched Items should be checked as this
will allow any time in the
file for matched employees
to process into BTE when
the file uploads. When
first testing or loading
time this option may be
turned off to allow review
and confirmation of hours
prior to moving to BTE to
confirm testing is
accurate.
OT
Reconciliation should be checked with the OT Calculation
Source listed as Peoplenet OT
Calculation. This
will allow the system to
compare the overtime hours
entered into the tool with
the overtime calculated by
Bullhorn according to the
state laws of that
employees’ work location.
If there is a discrepancy
that will cause a monetary
difference for AR, then it
will display a record on
the Overtime tab within
Exchange so the overtime
can be reviewed and
corrected. If a client has
abnormal overtime rules
that are enforced within
the tool, then the VMS OT
Calculation source can be
selected. This will load
the hours into BTE exactly
as they were received.
This means if the pay file
sends the reg and OT and
DT time that is in the BTE
timesheet to the payroll
system, then the hours as
entered in the VMS system
will load to payroll. This
also means that the VMS OT
Calculation source should
not be used if the VMS
does not force overtime to
be entered
correctly.
Ignore Pay
Record Sent and Reset Pay Record Sent should be checked if
you are allowing time
corrections (CPA) to
process from BTE into your
payroll system. If time
corrections will be
manually entered into the
payroll system these
should not be checked.
**NOTE: These do NOT need to be
checked if you are using
Bullhorn
One.

Report
Settings
On the Report
Settings tab, the
details of the reports
will be
entered.
Select Report then select
the Default Report then change the name of
Default Report that
populates into the Report Name. This
will help if additional
reports need to be created
for that
client/template.
Delivery
Type select Email
Delivered.
Leave Upload
Path, Approval
Type, and Approval Date as
they
default.
Mapping Code select FieldGlass
Mapping.
Import rules will be selected dependent
upon if a Revision field
was able to be added to
the
report.
VMS | Rules to Apply | Conditions |
---|---|---|
Fieldglass - With Revision #
field on the report | Keep only the
highest
revision Remove Timecards
with -ve value | The client supports negative
adjustments. This will cause the
system to only take the highest
numbered revision if there are
multiple revisions on the
file. |
Fieldglass - No revision #
on the report | Reject the file if there is a -ve
value | The client does not support
negative adjustments. This will
create an error if a client starts
to use revisions so the revision
column can be added to the report
at which time the import rules
should be updated
again. |

Schedule
Select the sub-tab Schedule to enter
the expected schedule of
the file. Select the
correct Time
Zone.
Select the Day and Time the file is expected to be
received
using

to add additional
days and times. For
Fieldglass it is scheduled
to run daily so add a
schedule for Monday, Tuesday, Wednesday, Thursday, and Friday at the
expected file time.
Enter a Window
Start and Window End meaning
the number of hours before
and after the arrival
time. This means that if
the file is expected at
3:00 AM and the Start and
End windows both are
2:00:00 then the system
will check if the file is
received between 1:00 AM
and 5:00 AM (2 hours
before 3:00AM and 2 hours
after 3:00AM) and create
an error if a file is not
received.

Email
Delivery
Select the sub-tab Email Delivery tab.
This will allow the
emailed file to import
into
Exchange.
From Address is fieldglass@fieldglass.net.
To Address is the email that Bullhorn
provided for Cert and then
will be updated to the
production email when
migrated to
production.
Subject Key
Words should be Scheduled report is
ready for
download.
Email Body URL
Key Words should
remain
blank.
Email Body
KeyWords would be
the report name including
your company and client
name and any defining
details of the report from
when you saved the report
in Fieldglass. It is
important that this
information is unique to
every file sent so the
system can correctly map
the file to the right
template and
schedule.
File
Extension is .CSV.
Header Row is 1.
File
Delimiter should
show as
“,”
Check the box for Has
Attachment.
Leave Is
Attachment Zipped and Do Not Convert to
CSV as
unchecked.

Template Settings
Tab
The Owner field can
be updated to select the
admin that will be
responsible for processing
the files for this client
or tool. This is
particularly helpful if
you have multiple admin’s
working in Exchange to
process files. If only one
admin will be working in
the system to process all
the files, then this field
can remain as Not
Assigned.

Exception Processing
Tab
On the Exception
Processing tab,
each exception type can be
set to one of the
following:
Ignore: No action required when this exception type is received, and there will be no changes made to the timesheet.
Load if Pay Record not Sent: No action required when this exception type is received, if the initial time loaded has not been sent to the payrolling system then the update to the hours/status will be loaded to BTE. **NOTE: This is not used for Bullhorn One.
Always Load: No action required when this exception type is received, the update to the hours/status will automatically load to BTE regardless of whether the pay record has been sent.
Manual Resolution: The exception will require review at which point the person can decide if it should be processed to BTE or Ignored which will leave the hours/status in BTE unchanged.
Duplicate Time Card: Set
to Ignore as there is no
update to the time or
status.
Time Adjustment Only: If
corrections will require a manual
update in the payrolling system
(not using Bullhorn 1), select Manual Resolution.
Otherwise, either Always Load or
Manual Resolution should be
selected depending upon if the
change in time should be reviewed
prior to processing to
BTE.
Approval Status Change
Only: Select Always
Load to automatically
update the timesheet status from
Pending to Approved. The hours
will not be impacted with this
exception.
Time and Approval Status
Change: Should be set to
the same processing type as a Time
Adjustment Only.
Multiple time cards
exception: This should be
sent to Manual Resolution so a person can review and confirm
it is additional time and not
duplicate time. The exception can
then be processed to add the time
or ignored.
Time History Detail Load
Failed: This should be set
to Manual
Resolution.
Time card is before start
date: This should be set
to either Manual Resolution or
Ignore dependent upon if there are
concerns about late time entry for
week endings prior to the
transition into
Exchange.

Map Earn Codes
Tab
The Map Earn Codes tab is
not needed for Fieldglass
templates as the earn codes are
already mapped
accordingly.
Rate Reconciliation
Tab
Rate Reconciliation can be
used for Fieldglass which will
allow the system to compare the
rate an employee has in the VMS
with the rate the person was set
up with in Bullhorn. This is
helpful for preventing AR
discrepancies that arise from rate
differences. When the rates are
different it will create an item
on the Rate Reconciliation tab to
be reviewed to determine which
system needs to be updated.
However, some margin of error
costs more to correct and will be
written off as a small balance so
the system can automatically
ignore those items. Enter the Margin of Error your
company is comfortable
with.
Leave Check Reg hours, Check
OT hours, and Check DT
hours checked.
Discount Source will
depend on if the Assignment includes the discount. If the
assignment does not include the
discount, but this client does
have a discount, select File
template and enter the discount
percent.

Resolution Settings
Tab
The Resolution Settings tab can be used to set emails to
send upon resolution of files by
entering the Name, Email
Address, selecting Contact Type, and checking Auto Send Resolutions
Email. The message can be
customized by entering information
into the boxes at the
bottom.
Once all updates are made to the
template select Save &
Close.

Exchange Test File
Import
If testing with current files,
then the file will run according
to the schedule in Fieldglass and
import into Exchange for testing.
On the first date scheduled to
run, the report should show under
the File Activity
tab.
If testing with older dates,
login to Fieldglass and Select
Analytics>My Reports and find
the file that was created earlier.
Select Actions>Go to Run Time
Page. This will retrieve the saved
report features on a run page.
Change both the Time Sheet Submit
Date to Between and enter the
dates of the time period for
testing and select Run. Which will
download a file using those
dates.
Return to Exchange Cert
Environment and
Select

In the window that pops up select
Choose File and locate the file
downloaded. Then select the
correct Template/File set up and
select OK.

A confirmation window will appear
at which point select OK again. It
may take a few minutes for the
file to show onto the File
Activity tab.
Use the blue hyperlink of the
File Template Name to review the
details and process the file. **see file processing
document (not yet
created)
Once the file is complete another
file can be run for additional
submit dates to then process and
review how the system handles the
file.

Move to Production
After sufficient testing has been
completed and it is time to
migrate this client to production,
the template will need to be
exported from Cert. If you are
implementing exchange for the
first time, transferring the
templates to production may be
completed by your Implementation
team. However, you will be
responsible for updating the
fields within each template if
needed.
Log in to the Cert
environment.
Select the templates for Export
with the right-hand check
boxes.
Select Export
Templates.
A file will download to your
computer.
Log in to the Production
environment.
Select Import Template and browse
to the file you
downloaded.
The templates will appear in the
new environment after you refresh
the page.
You should review the new
templates to make sure that the
settings are appropriate for the
new environment. Correct the To
Email Address under the Report Settings to the
production email provided by
Bullhorn, enter the Start
Date as the first date for
which you do not want hours to
load, confirm all client IDs have
been updated on the template if
necessary, and update the schedule if needed to
account for each day the report
should be received by the
system.
FAQ
Q: Why can’t I find
the Revision field to add
to my
report?
A: The client did
not opt to have the
ability to revise
timesheets within
Fieldglass so corrections
are done through
Credit/Debit Memos. The
report can be created
without that field but
leaving the other fields
in their respective
places. It is important to
select the correct Report
Input Rules on the
template.
Q: I set up a new
file in Fieldglass, but
the file did not load to
Exchange?
A: Confirm the file
emailed to the Exchange
inbox otherwise updates
may need to be made to the
schedule within
Fieldglass. Check the
details on the email with
the details entered in
Report>Email Delivery.
Also confirm that the key
words are specific enough
to the individual report.
If there is another report
in any of your templates
or another customer’s
template with the same
report name, the report
will not be able to load.
Therefore, it is
recommended you include
your company name and the
client’s name within the
template.
Q: All of my
Fieldglass reports were
not received by Exchange
even though previous
reports have been
received?
A: Log into
Fieldglass and select
Analytics>Report
Outputs. This page should
show you the reports
recently run so if it does
not reflect on this page
then the report failed to
run within Fieldglass.
Review your report
schedule to ensure it is
still accurate and then
reach out to Fieldglass to
see if there is a system
issue that prevented the
report from running. If
the report shows on the
Report Outputs page but
still does not reflect
within Exchange, check the
email inbox for your
Exchange reports for the
email. Change it back to
unread if it is reflecting
in the inbox to have the
system pick up the file
for processing
again.
Q: My file failed
because of a negative
value, what do I
do?
A: When the file
was set up it is likely
that the revision field
was not in Fieldglass so
it is not set up on the
report that is loading
into Exchange. Go into
Fieldglass and add the
revision field into the
correct order on the
report. Once that update
is saved on the report and
schedule, then the
template needs to be
updated as well. On the
Report General tab the
import rules need to be
updated to include “Keep
only the Highest
Revision'' and “Remove
Timecards with –ve value.”
A new report can be
manually run from
Fieldglass including that
revision column and then
uploaded into Fieldglass
or you can wait until the
next day when the
scheduled report will
run.
Q: I have
exceptions that state the
time is before the Start
date. Why did these
create?
A: The start date
entered should be the
first date for which you
do not want time to load.
For example, if the first
timesheet to load in
Exchange is for Monday
10/11/2021-10/17/2021,
then the Start Date should
be entered as
10/10/2021.
Q: I tried to run
the report in Fieldglass
but it gives an error that
there are over 500
columns. What should I
do?
A: If you remove
the Bill Rate column
and run the report,
then it should
successfully run. The
Bill Rate field
provides the bill
rates onto the report
so the rate recon
comparison can take
place. Once the report
runs, the columns
showing the hours
worked can be used to
determine which rates
are important to
include. Very often
there are many rate
categories that are
not used by the client
so only those rate
categories that are
used can be selected
to help limit the
number of columns to
report pulls. Once the
rates categories that
should be selected
have been determined,
add the bill rate
column back on the
report. Then under the
Filters, select the
Rate Category filters
and only select the
rate categories that
are used by this
client and move them
to the right side of
the screen. Save the
updates to the report
and try and run it
again. This should
allow the report to
run without the 500
column
error.
Proprietary Notice and
Disclaimer
© 2016 Bullhorn Inc. The
information contained herein
is Confidential and
Proprietary to Bullhorn, and
cannot be divulged to any
third party without the prior
written consent of
Bullhorn.
This Proposal, including
all related enclosures and
attachments, is to be used for
evaluation purposes only. You
may make and distribute copies
of the Proposal to those
employees and consultants who
have a need-to-know during
your review period. In the
event the contract award is
not granted to Bullhorn, this
Proposal in its entirety must
either be destroyed or
returned to Bullhorn, as
directed by
Bullhorn.
Unless otherwise noted,
this Proposal is valid for a
period of 60
days.
Bullhorn Proprietary: For
Use by Bullhorn Customers for
Planning Purpose Only
(Forecasted Dates May Change
without Notice). The following
information is furnished for
informational use only, is
subject to change without
notice, and should not be
construed as a guarantee,
commitment, condition, or
offer by
Bullhorn.